Click here for entire 210-NEM in one file.
Table of Contents
Part 500 – Introduction
500.0 Purpose
500.1 Abbreviations
500.2 Policy
Part 501 – Authorizations
Subpart A – Review and Approval
501.0 General
501.1 Scope
501.2 Technical Quality
501.3 Compliance of Engineering Work With Laws and Regulations
501.4 Engineering Job Approval Authority
501.5 Engineering Job Review
501.6 Engineering Work Reviewed for Other Agencies
501.7 Classification of Engineering Jobs
501.8 Engineering Job Classifications That Utilize Controlling Factors
501.9 Engineering Job Approval Authority
Subpart B – Repair and Rehabilitation
501.20 General
501.21 Scope
501.22 Applicable Standards
501.23 Dams Installed Without NRCS Assistance
501.24 Special Conditions
Subpart C – Variance and Changes
501.30 General
501.31 National Handbook of Conservation Practices
501.32 Channel Stability Criteria
Subpart D – Engineering Work on National Forests
501.40 General
Subpart E – Assistance of Shoreline Erosion Control
501.50 General
501.51 Scope
501.52 Coordination with U.S. Army Corps of Engineers (USACE)
501.53 Requirements for Assistance
Part 503 – Safety
Subpart A – Engineering Activities Affecting Utilities
503.0 General
503.1 Scope
503.2 General Considerations
503.3 Investigations
503.4 Buried Utilities
503.5 Documentation
503.6 State Laws
Subpart B – Public Safety at Structure Sites
503.10 General
503.11 Scope
503.12 Recommended Safety Measures
503.13 Maintenance of Steep Slopes
Subpart C – Safety During Geologic Investigations
503.20 General
503.21 Scope
503.22 Hazard Potential
Subpart D – Dam Safety
503.50 Involvement With Dams
503.51 USDA Involvement
503.52 NRCS Dam Safety Officer
503.53 Interagency Involvement
503.54 Other (Nongovernmental) Involvement
503.55 NRCS-State Relationships
503.56 Responsibility for Dams
503.57 NRCS Assistance
503.58 Key Factors
503.59 Assistance to State Dams Safety Programs
503.60 Department of Homeland Security
503.61 DamWatch
Subpart E – Prohibited Technical Assistance
503.70 General
503.71 Prohibited Activities
Part 504 – Special Investigations, Studies, and Reports
Subpart A – Problems and Deficiencies
504.0 General
504.1 Scope
504.2 Reporting Problems, Deficiencies, and Failures
504.3 Committee Assignments
504.4 Procedures
504.5 Engineering Report
504.6 Report Review and Acceptance
504.7 Release and Distribution of Reports
Subpart B – Emergency Spillway Performance
504.10 General
504.11 Scope
504.12 Reporting Major Flows
504.13 Assignments
504.14 Procedures
504.15 Report
504.16 Review and Approval
Subpart C – Reservoir Sedimentation Surveys
504.20 General
504.21 Procedures
504.22 Reports
Subpart D – Field Trials and Evaluations
504.30 General
504.31 Scope
504.32 Approval Procedures
504.33 Study Plan
504.34 Reports
Part 505 – Non-NRCS Engineering Services
Subpart A – Introduction
505.0 General
Subpart B – Procedures
505.10 Technical Service Providers
505.11 Non-TSP Providers
505.12 Conservation Contractors
505.13 Engineering Services Contracts and Agreements
505.14 Exchange of Technical Services Between Government Agencies
505.15 Standard Designs and Drawings
505.16 Engineering Services Not Provided by NRCS
Subpart C – Exhibits
505.20 Conservation Contractor Sample Letter
Part 506 – Technical Materials
506.0 General
506.1 Definitions
506.2 Organization of Permanent Materials
506.3 Reserved
506.4 Developing NEH Materials
506.5 Distribution of Engineering Technical Materials Within NRCS
506.6 Distribution of Engineering Technical Materials Outside NRCS
Part 510 – Planning
510.0 General
510.1 Scope
510.2 Documentation
510.3 Engineering Data to Support Plans
510.4 Criteria
510.5 Cost Estimates
510.6 Postdesign Life Considerations
Part 511 – Design
Subpart A – Procedures
511.0 General
511.1 Scope
511.2 Design Stages
511.3 Operating Procedures
511.4 Design Analysis
511.5 Design Checking and Review
511.6 External Reviews
511.7 Design Criteria
511.8 Construction Drawings and Specifications
Subpart B – Documentation
511.10 Scope
511.11 Design Folders
Subpart C – Instrumentation
511.20 General
511.21 Scope
511.22 Need for Reliable Instruments
511.23 Use of Instrumentation
511.24 Instrumentation Plans
511.25 Instrumentation Monitoring and Reporting
Part 512 – Construction
Subpart A – General Information
512.0 Introduction
512.1 Scope
512.2 Definitions
512.3 Value Engineering
Subpart B – Preconstruction Activities
512.10 Selection of the Contractor
512.11 Prebid or Proposal Meeting (Site Showing)
512.12 Evaluation of Bidders
512.13 Preconstruction Conference
512.14 Partnering
Subpart C – Evaluation of Construction Materials
512.20 General
512.21 Evaluation Procedures
512.22 Waivers of Material Certifications
512.23 Prequalification of Materials
Subpart D – Quality Assurance Activities
512.30 General
512.31 Definitions
512.32 QA Procedures
512.33 Inspection of Materials
Subpart E – Equipment, Records, and Coordination
512.40 Engineering Equipment
512.41 Records
512.42 Coordination Between Disciplines
Subpart F – As-Builts
512.50 General
512.51 Scope
512.52 Documentation
512.53 Disposition
512.60 General
512.61 Personal Protective Equipment (PPE)
512.62 Training
Subpart G - Safety
Subpart H - Exhibits
512.70 Exhibit A – OSHA 3071 Job Hazard Analysis
512.71 Exhibit B – NRCS Job Hazard Analysis Form
Part 520 – Soil and Water Resource Development
Subpart A – Erosion and Sediment Control
520.0 General
520.1 Minimizing Erosion and Sediment During Construction
Subpart B – Floodplain Management
520.10 General
520.11 Scope
520.12 Description
520.13 Types of Measures
520.14 Risk to Life and Property
Subpart C – Dams
520.20 General
520.21 Definition and Classes
520.22 Design Criteria
520.23 Classification
520.24 Special Considerations
520.25 Clearing Reservoirs
520.26 External Reviews for Dam Safety
520.27 Emergency Action Plans – High Hazard Potential Dams
520.28 Potential Impact Area – Low Hazard Potential Dams of Inventory Size and All Significant Hazard Potential Dams
Part 521 – Reserved
Part 522 – Snow Survey and Water Supply Forecasting
522.0 Reservoir Operations Guides
522.1 Authority and Request for Assistance
522.2 Responsibility
522.3 NRCS Technical Review
522.4 Reservoir Operations Guide Review
Part 523 – Irrigation
523.0 General
523.1 Scope
Part 524 – Drainage
524.0 General
524.1 Scope
Part 529 – Reserved
Part 530 – Hydrology
Subpart A – Hydrologic Investigations
530.0 General
530.1 Available Hydrometeorological Information
530.2 Hydrometeorological Instrumentation
530.3 Hydrologic Reports
Subpart B – Hydrologic Procedures and Criteria
530.10 General
530.11 Hydrologic Procedures
530.12 Hydrologic Criteria
Part 531 – Geology
531.0 Purpose
531.1 Definitions
531.2 Responsibilities
531.3 Levels of Geologic Investigations
531.4 Requirements for All Geologic Investigations
531.5 Classification and Logging of Soil and Rock
531.6 Requirements for Group A Structures Designed With Vegetated and Earth Auxiliary Spillways
531.7 Geologic Reports
531.8 Geologic Information Provided to Potential Construction Contractors
Part 532 – Reserved
Part 533 – Geotechnical Engineering
Subpart A – General
533.0 General
533.1 Responsibilities
Subpart B – Engineering Classification of Soils
533.10 Scope
533.11 Soil Classification Systems
Subpart C – Operations
533.20 General
533.21 Data Collection
533.22 Testing
533.23 Geotechnical Engineering Analyses
Part 535 – Landscape Architecture
535.0 General
535.1 Scope
535.2 Definitions
535.3 NRCS Technical Assistance for Landscape Architecture
Part 536 – Structural Engineering
536.0 General
536.1 – 536.9 Reserved
536.10 Method
536.11 Function
536.12 Loads
536.13 – 536.19 Reserved
536.20 Design Criteria for Reinforced Concrete Structures
536.21 Design Criteria for Reinforced Concrete Hydraulic and Environmental Structures
536.22 Design Criteria for Reinforced Concrete Slabs – On-Ground
536.23 Existing Designs for Reinforced Concrete Structures
536.24 – 536.29 Reserved
536.30 Design Criteria for Steel Structures
536.31 – 536.39 Reserved
536.40 Design Criteria for Wood Structures
536.41 – 536.49 Reserved
536.50 Design Criteria for Masonry Structures
536.51 – 536.59 Reserved
536.60 Design Criteria for Bridges
536.61 – 536.69 Reserved
536.70 Standard Designs
536.71 Use of Standard Designs
536.72 Standard Design Drawings
536.73 Adaptation of Standard Design Drawings
536.74 Revision of Standard Design Drawings
536.75 Availability of Standard Design Drawings to the Public
536.76 National Standard Detail Drawings
536.77 State Standard Detail Drawings
536.78 Standard Detail Drawings Prepared by Non-NRCS Engineers
Part 537 – Reserved
Part 540 – Field Surveys
540.0 General
540.1 Responsibility
540.2 Format
540.3 LiDAR Data
540.4 Precision and Accuracy
540.5 Staking
540.6 Contractor Surveys
540.7 Checking
Part 541 – Drafting and Drawings
541.0 General
541.1 Media
541.2 Sheet Size
541.3 Title Blocks
541.4 Cover Sheet
541.5 Orientation
541.6 Style and Content
541.7 Standard Title Block for ANSI A (8.5x11) Sheet
541.8 Standard Title Block for ANSI B (11x17) and ANSI D (22x34) Sheets
541.9 Standard ANSI A (8.5x11) Sheets
541.10 Standard ANSI D (22x34) and ANSI B (11x17) Sheets
Part 542 – Specifications
Subpart A – Construction Specifications
542.0 General
542.1 Scope
542.2 Preparation of Standard Specifications
542.3 Reference Specifications
Subpart B – Engineering Services Specifications
542.10 General
542.11 Technical Services
Subpart C – Exhibits
542.20 List of Reference Specifications
Part 543 – Materials
543.0 General
543.1 Scope
543.2 Use of New Materials
543.3 New Material Specification Preparation
Part 544 – Equipment
544.0 General
544.1 Radiation Use Permits
544.2 Transporting Equipment
544.3 Adjustment and Calibration
544.4 Maintenance
544.5 Storage
544.6 State Procedures
|