TR_210 - TR-210 - Engineering Technical Releases
TR-210 - Engineering Technical Releases

The following are links to engineering technical releases:

  • TR-210-01 - Routing Through Tide Gates (7/1955)
  • TR-210-03 - Hood Inlets for Culvert Spillways (6/1956)
  • TR-210-04 - Height of Water Column Supported by Atmospheric Pressure (6/1956)
  • TR-210-05 - Structural Design of Underground Conduits (11/1958)
  • TR-210-17 - Geologic Investigation for Watershed Planning (3/1966)
  • TR-210-18 - Computation of Joint Extensibility Requirements (8/1969)
  • TR-210-19 - Determination of Storage Requirements to Meet Supply Demand Relationships (3/1962)
  • TR-210-19-A - Revision of Reservoir Operations Study Computer Program and User Manual, Appendix A (3/1988)
  • TR-210-24 - Investigating Structural Problems (Second Edition) (2/1983)
  • TR-210-25 - Design of Open Channels (9/1977)
  • TR-210-25-A - Design of Open Channels, Appendix A, Stream Armor Design Concepts (10/1977)
  • TR-210-26 - The Use of Soils Containing More Than 5% Rock Larger Than the No.4 Sieve (12/1964)
  • TR-210-27 - Laboratory and Field Test Procedures for Control of Density and Moisture of Compacted Earth Embankment (including Notice) (2/1965)
  • TR-210-29 - Hydraulics of Two-Way Covered Risers (6/1965)
  • TR-210-30 - Structural Design of Standard Covered Risers (including Notice TR 30-1) (4/1965)
  • TR-210-31 - Structural Analysis and Design at Low Stage Inlets (6/1966)
  • TR-210-33 - Simplified Method for Determining Floodwater Storage (4/1978)  
  • TR-210-35 - Method of Reservoir Flood Routing (2/1967)
  • TR-210-37 - Structural Analysis and Design at Base of Riser With Conduit Openings in Both Endwalls (12/1967)  
  • TR-210-39 - Hydraulics of Broad-Crested Spillways (5/1968)
  • TR-210-42 - Single Cell Rectangular Conduits Criteria and Procedures for Structural Design (12/1969)
  • TR-210-43 - Single Cell Rectangular Conduits Catalog of Standard Designs (1/1970)  
  • TR-210-45 - Twin Cell Rectangular Conduits-Criteria and Procedures for Structural Design (9/1970)
  • TR-210-46 - Gated Outlet Appurtenances, Earth Dams (12/1982)
  • TR-210-46-1 - Gated Outlet Appurtenances, Earth Dams, Amendment 1 (8/1984)
  • TR-210-47 - Classification System for Varied Flow in Prismatic Channels (2/1971)
  • TR-210-48 - SITES Water Resource Site Analysis Computer Program User's Guide (11/2005)
  • TR-210-49 - Impact Basins Associated With Full Flow in Pipe Conduits (3/1971)
  • TR-210-50 - Design of Rectangular Structural Channels (Revision 1) (7/1977)  
  • TR-210-54 - Structural Design of SAF Stilling Basins (10/1974)
  • TR-210-54-1 - Structural Design of SAF Stilling Basins, revised wingwall design, Amendment 1 (9/1981)
  • TR-210-56 - A Guide for Design and Layout of Vegetative Wave Protection for Earth Dam Embankments (4/2014) 
  • TR-210-57 - Flood Proofing (1/1975)
  • TR-210-59 - Hydraulic Design of Riprap Gradient Control Structures (1/1976)
  • TR-210-59-1 - Graphical Solution for the Hydraulic Design of Riprap Gradient Control Structures, Amendment 1 (7/1976)
  • TR-210-59-2 - Water Surface Profiles and Tractive Stresses for Riprap Grade Control Structures, Supplement 1 (2/1978)
  • TR-210-59-3 - Water Surface Profiles and Tractive Stresses for Riprap Grade Control Structures, Revised Pages, Supplement 2 (3/1986)
  • TR-210-60 - Earth Dams and Reservoirs (Revised July 2005) (7/2005)
  • TR-210-62 - Engineering Layout, Notes, Staking, and Calculations (1/1979)
  • TR-210-63 - Structural Design of Monolithic Straight Drop Spillways (2/1977)
  • TR-210-65 - Procedures to Establish Priorities in Landscape Architecture (10/1978)
  • TR-210-66 - Simplified Dam-Breach Routing Procedure (third edition) (9/1985)
  • TR-210-67 - Reinforced Concrete Strength Design (8/1980)
  • TR-210-68 - Seismic Analysis of Risers (4/1982)  
  • TR-210-69 - Riprap for Slope Protection Against Wave Action (2/1983)
  • TR-210-70 - Hydraulic Proportioning of Two-Way Covered Baffle Inlet Riser (9/1983)
  • TR-210-74 - Lateral Earth Pressures (7/1989)
  • TR-210-75 - Reservoir Storage Volume Planning (7/1991)
  • TR-210-78 - The Characterization of Rock for Hydraulic Erodibility (6/1991)
[TR_210 - May 2008]